Demolition contractor in Manhattan
In Manhattan the work is almost entirely inside, and the building decides how it runs.

Manhattan building stock
Manhattan is interior work. Pre-war co-ops on the Upper East and Upper West Sides, loft buildings in SoHo, Tribeca and the Flatiron, post-war and new-build condo towers, and a very large stock of office and retail space that turns over between tenants. Whole structures do come down here, but they are the exception and they are development-scale.
What that means for a job in Manhattan
The alteration agreement is the job spec
Hours, which lift you get and for how long, what protection goes down in the lobby and corridor, and what the building needs on file before access is granted. We read it and plan to it. A two-hour daily lift window changes crew size and sequence more than the scope does.
There is usually nowhere to put a container
Kerbside space is scarce and often needs a permit. Debris is staged inside and moved in booked windows rather than accumulating, because there is nowhere for it to accumulate.
Pre-war stock is asbestos stock
Ceiling voids, floor tile and pipe lagging in older Manhattan buildings routinely turn up positive. The assessment goes in first, because in a building with a booked lift window a delay is not just a delay, it is a lost slot.
What we do most of in Manhattan
Everything we offer is available here. These are the jobs the local building stock actually generates.
-
Residential interior demolition Gut-outs of apartments, co-ops, brownstone floors and whole house interiors See the service
-
Commercial demolition Fit-out strip-outs and whole commercial structures, around a live building See the service
-
Selective demolition Precise removal where the building around it has to survive intact See the service
-
High-rise and multi-storey demolition Floor-by-floor work above the fourth storey See the service
-
Bathroom demolition Fixtures, tile, mud beds and waterproofing taken back to the substrate See the service
Coverage across Manhattan
We work across the pre-war co-op blocks of the Upper East and Upper West Sides, the loft buildings of SoHo, Tribeca and the Flatiron, and the office and retail stock from Midtown down to the Financial District.
Work here files with the New York City Department of Buildings, and the pre-1987 asbestos rule applies.
Demolition in Manhattan: your questions
Our building only allows work between nine and four.
That is normal here and we plan to it. It changes the programme rather than the method, and we would rather build the schedule around the real window than promise a date that ignores it.
How does debris leave a tower?
By service lift in booked slots, or by chute where the building has one. That route is the first thing we establish, because everything else is scheduled around it.
Do you handle the board and the managing agent?
We work to the alteration agreement and keep the agent and the super informed. Getting the alteration approved in the first place is your architect or expediter’s work, not ours.
Beyond Manhattan
Working in Manhattan?
Call and describe the job. Most of the time we can scope it on the phone and confirm on site.
Seven days a week, 7am to 11pm. Emergency calls answered around the clock.
Send the details