Demolition permitting service
The filing, the documents it depends on, and the order to get them in so your start date does not slip.

When people call us about demolition permitting
- You need a demolition permit and do not know where to start
- A filing has stalled and you cannot work out which document is holding it
- You want the paperwork carried by the same contractor doing the work
- You need to know how long this will realistically take before committing
What demolition permitting covers
- Full demolition applications filed in DOB NOW: Build
- Utility disconnect certifications for gas, electric, water and steam
- Notice to adjoining owners
- Rodent extermination certification
- Site safety plan or waiver submission
- ACP-5 asbestos assessment coordination with a DEP-certified investigator
- Pre-demolition inspection scheduling, the two-day start notice, and post-demolition sign-off
The order matters more than the effort
Almost every stalled demolition filing is stalled on the same two things: the asbestos assessment was started late, or a utility certification has not come back. Both are outside your control once requested and both have to be in before the permit issues, so both go in on day one. Everything else can be done in parallel. Industry practice puts a typical full-demolition front end at around four to eight weeks when it is run that way. That is a typical range from practice, not a commitment from DOB.
How demolition permitting runs
The order matters more than the tools. This is the sequence for demolition permitting.
Establish the path
Full demolition, Alt-2 interior, or work small enough to sit outside a filing. Everything downstream depends on this answer being right.
Start the long leads
Utility disconnect requests and the asbestos investigator go first, on day one, because they are the items you cannot accelerate later.
Assemble the package
Adjoining-owner notice, rodent certification, site safety submission and plans, gathered while the long leads run.
File and respond
Application submitted in DOB NOW: Build, with objections answered as they come rather than in a batch at the end.
Permit, notice, inspection
Permit issues, DOB is notified two days before work starts, and the post-demolition inspection is scheduled for sign-off.
What moves the price on demolition permitting
Every one of these moves the number, so you can see what a quote is actually responding to — and tell us the ones you already know when you call.
- Whether it is a full demolition or an interior filing
- How many utility services need certification
- Whether the asbestos assessment comes back clear or triggers abatement
- Whether adjoining owners are straightforward to notify
- How many objections come back on the application

Demolition permitting: your questions
Can you file for a demolition someone else is carrying out?
Call and describe the job. The filing carries responsibility for the work described in it, so who signs depends on who is performing and supervising the demolition. We will tell you on the phone whether we can file it for your arrangement.
What actually holds these up?
Overwhelmingly the asbestos assessment and the utility disconnect certifications. Neither can be rushed once requested, which is exactly why they both go in first.
Do I need a permit for interior work?
Usually an Alt-2 filing once the work involves several trades and goes beyond cosmetic removal. It does not change the building’s use, egress or occupancy, which is what keeps it out of the heavier filing types.
Related to demolition permitting
-
Building violation removal Physical work to clear the condition behind a violation See the service
-
Asbestos and hazardous material Assessment coordination, identification and safe routing See the service
-
House demolition Whole dwellings taken down under permit, lot cleared to grade See the service
-
Demolition site preparation Protection, isolation, access and safety set up before work starts See the service
-
Commercial demolition Fit-out strip-outs and whole commercial structures, around a live building See the service
Get a price for demolition permitting
Call and describe the job. Most of the time we can scope it on the phone and confirm on site.