Asbestos and hazardous material removal
The step that decides your start date, handled first rather than discovered halfway through. We run the assessment, we handle the hazardous material that comes out with a demolition, and we hold the schedule around abatement when it is needed.

When people call us about asbestos and hazardous material
- Your building predates 1987 and the work needs a permit
- Suspect material has turned up on a job already under way
- A filing is waiting on an asbestos assessment
- There is old pipe lagging, floor tile or cement sheeting you do not want to touch
What asbestos and hazardous material covers
- Coordination of a DEP-certified asbestos investigator
- ACP-5 assessment report filed with DEP and verified by DOB
- Identification of the usual suspects: pipe lagging, nine-inch floor tile and its black adhesive, cement sheeting, joint compound, boiler insulation
- Routing of positive findings to licensed abatement before demolition proceeds
- Segregation of contaminated material out of the C&D stream
- Lead paint: pre-1978 coatings treated as suspect, kept out of the general debris stream and routed separately
- Handling of other hazardous items found on site, so they do not travel in the wrong load
What the ACP-5 actually says
It is a report by a DEP-certified investigator confirming your work will not disturb asbestos-containing material, or that what is there is below the DEP threshold of ten square feet or twenty-five linear feet of friable material and will not be disturbed. It is required for renovation, alteration or demolition in a building put up before 1 April 1987 where the work needs a DOB permit, and DOB will not release that permit until it is on file. On a full demolition it also has to be in before sign-off. If material is found above threshold, the answer is abatement first, not a different report.
How asbestos and hazardous material runs
The order matters more than the tools. This is the sequence for asbestos and hazardous material.
Establish the building age
Before 1 April 1987 and needing a DOB permit means an assessment is required. That one date decides whether your project has an extra step on its critical path, so it is the first thing we check.
Instruct the investigator
A DEP-certified asbestos investigator surveys the specific scope of work. We arrange it and brief them on exactly what is coming out, because the report covers the described work rather than the building in general.
The ACP-5 is filed and verified
Filed with DEP, verified by DOB. Until it clears, the construction permit does not issue — which is why this runs first and not alongside the drawings.
Positive above threshold goes to abatement
Licensed abatement runs ahead of demolition under its own permit. We hold the programme around that window rather than letting the two trades collide.
Then the demolition starts
With clearance in hand, the strip-out or take-down proceeds, and any lead-painted or otherwise contaminated material is kept out of the C&D stream on the way out.
What moves the price on asbestos and hazardous material
Every one of these moves the number, so you can see what a quote is actually responding to — and tell us the ones you already know when you call.
- Building age, which decides whether an assessment is required at all
- How much material has to be sampled and how accessible it is
- Whether findings are clear or trigger abatement
- Abatement volume, if it is required
- Programme impact, since abatement sits ahead of demolition rather than beside it

Asbestos and hazardous material: your questions
What about lead paint?
Coatings applied before 1978 may contain lead, which puts them in the same category as asbestos for disposal: lead-contaminated material is not construction and demolition debris and cannot travel in a C&D load. On a strip-out we treat pre-1978 painted surfaces as suspect, keep that material out of the general stream and route it separately. Where a job would disturb lead paint at scale, that work is separately regulated, and we arrange the certified specialist and sequence that work ahead of ours the same way we do with asbestos.
My building is from 1985. Do I definitely need this?
If the work needs a DOB permit, yes. The line is 1 April 1987 and it applies to the building, not to the room you are working in. Most New York housing stock sits on the wrong side of that line.
Can you just take the tile up and see?
No. Disturbing suspect material to identify it is the thing the rule exists to prevent. It gets assessed by a certified investigator first, and that is not a step we will work around.
What if the report comes back positive?
The job goes to licensed abatement before demolition can proceed. That changes the programme and the cost, and it is far better to know at week one than at week six.
Who does the abatement if the report is positive?
Licensed abatement is its own permitted trade and it runs ahead of demolition, not beside it. We instruct the investigator, hold the programme around the abatement window, and pick the job back up the moment clearance comes through, so the two halves are managed as one schedule rather than handed between strangers.
Related to asbestos and hazardous material
-
Demolition permitting The filing, the documents behind it, and the sequence they go in See the service
-
Insulation removal Old batt, loose-fill and board insulation extracted and bagged See the service
-
Flooring demolition Tile, timber, carpet, adhesive and subfloor removal See the service
-
Debris removal Construction and demolition debris cleared, sorted and hauled See the service
-
House demolition Whole dwellings taken down under permit, lot cleared to grade See the service
Get a price for asbestos and hazardous material
Call and describe the job. Most of the time we can scope it on the phone and confirm on site.
Seven days a week, 7am to 11pm. Emergency calls answered around the clock.
Send the details